revision zone question
when you have a multi-sheet drawing, what is the drafting standard for the zone callout when you have changes on sheet 3 of 5?  would it be p3-c2?
i've used "sht 3, zn c2".
i have always called them out as if xyz coordinates.
whatever is across the bottom first (x), then up the side (y).
zone 4c (xy)
chris
solidworks 06 5.1/pdmworks 06
autocad 06
the changes are highlighted in order by sheet.  so i do everything in sheet 1 first, then 2, 3, etc.  by doing so, i only need to call out the zone because the sheet number is implied.
in other cases, i use 3-c2, where 3 is the sheet number and c2 is the zone.  there have only been a few people that haven't intuitively understood what that callout means when reading it in context of the print.  and when i say "sheet & zone" over the phone, that's all it takes.
--scott
when multi sheets are involved, there should be a table on the first sheet that indicates which sheet has which rev. it will not call out zones, only revs.
chris
solidworks 06 5.1/pdmworks 06
autocad 06
if you must use it shouldn't it be sh not sht.
in the uk we just listed this on the 'amendment' (eco to most of you).  each sheet of a drawing had a separate section on the form so indicating 'sheet' wasn't an issue.
my current place in the us doesn't go into anywhere near this much detail most of the time.
it's kinda old school to have different rev's for each sheet of a drawing, especially in a pdm or plm enviroment.  
i was recommend coming up with an understood system for your group (company?) or your own person use (which ever applies).
  
matt
cad engineer/ecn analyst
silicon valley, ca
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2024-12-22 21:21 , Processed in 0.035037 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表