cooper loading on box culver

[复制链接]
发表于 2009-9-8 13:55:11 | 显示全部楼层 |阅读模式
cooper loading on box culvert
i am designing my first box culvert for cooper e80 loading.  i'm not sure i understand the earth pressure loadings and the section/article 2.2.3c(2)of arema 2004 is confusing too.  can anyone help me out with some clarification?
thanks
check out chapter 16 (reinforced concrete box culverts) figure 16-1 it explains some of the load distribution.
best, tincan
the requirements are outlined in part 16 of chapter 8 of the arema manual.
i see those diagrams, but what if i have two or more tracks next to each other?  if i follow the 2:1 slope rule, the pressures would overlap and article 16.4.3b says not to increase the loads for multiple track loadings.  however, in article 2.2.3c(6)multiple track loading is considered.  sections 2.2.3c and 16.4.3 seem to contracdict one another in more than one way.  am i making this too complicated?
as a suggestion, run out the loadings for one track and for multiple tracks.  you should reach a point (depth) where the loads equal, same as for highways.  take the loading (max or average) that youre comfortable with.
?whats the depth of the rcb?
thanks for your reply "tincan"!
the bottom of rail of the dual track portion is around 4.5' to 5.5' above the top of the rcb.  another area has multiple tracks and will temporarily be 16'+/- above the top of the rcb.
take the worst case.  the rr's like overdesigned massive structures, it lessens maintenance and future problems. the last one i did for the bn was so over designed that it will be here at the second comming.
tincan.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-13 16:49 , Processed in 0.036958 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表