horizontal construction joints in concrete walls
what types of restrictions do you usually put on the placement of horizontal construction joint in basement walls or interior shear walls? it seems that requiring a class 'b' tension splice of your reinforcing bars and requiring the concrete surface to be roughened to a 1/4" amplitude would accomodate your flexural and shear requirements, respectively.  but what if the contractor is locating two construction joints within the development length of the flexural reinforcement, say a joint within ld from the bottom of the wall?  thoughts?

within ld from the bottom of the wall?  how tall is that, 2 or 3 feet?  sounds like the contractor needs taller forms.
a very unique situtation on this job i am working on, mat foundation with several feet of granular fill on top, with a slab-on-grade on top.  contractor is proposing to place a construction joint at the same elevation as the slab-on-grade, approx 4.5' above the mat foundation.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-18 17:57 , Processed in 0.035439 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表