几何尺寸与公差论坛

 找回密码
 注册
查看: 464|回复: 0

emporary construction loads

[复制链接]
发表于 2009-9-16 13:04:11 | 显示全部楼层 |阅读模式
temporary construction loads
i am in the process of restoring a concrete parking garage topped with asphalt designed for 2000# concetrated loads (not alot considering weights of asphalt spreaders, rollers and bobcats with filled buckets)
i understand i can allow higher loads during construction (restoration) since they are only temporary. anyone have  guidance to such increases allowed or code references pertaining to this?
thanks all!
go purchase asce 37:
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-11 22:34 , Processed in 0.037577 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表