几何尺寸与公差论坛

 找回密码
 注册
查看: 452|回复: 0

oe plate requirements

[复制链接]
发表于 2009-9-16 14:59:41 | 显示全部楼层 |阅读模式
toe plate requirements
there is a pipe penetration thru platform grating. is toe plate required for this penetration? what are osha's requirements for toe plate in this case?
thanks,
ibro  v.
i think that the purpose of a toe plate is to keep objects from falling through the hole as well as keep people from slipping under the mid-rail.  if the opening between the grating and the pipe is small enough you should be ok without a toe plate.  how large is the pipe and how large is the opening?
i would use banding on the grating. also, as stated above, i would keep the gaps to minimum. a general rule that i used for many years is the coke bottle (2 inch diameter sphere) should be able to fall through any gap.
good luck
regards,
lutfi
here is what we follow:
for pipe penetration requring 6" dia clear opening or greater, use a 1/4" thick, 6" high collar band. for smaller openings weld a 1/4"x4 1/2" gelvanized checker plate split ring (horizontally)to the grating (around the pipe).
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-11 18:07 , Processed in 0.035965 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表