application of snow drift loads on multi-stepped buldings
i have a question on the use of the snow load provisions of asce7-05.
we have a mid height canopy to a low rise theatre with a higher building adjacent to this. which length do i take for snow drift, the theatre roof only or the theatre roof plus the higher building?