belled piers

[复制链接]
发表于 2009-9-7 15:21:41 | 显示全部楼层 |阅读模式
belled piers
just wondering if anyone around the us still use belled piers (caissons)?   
check out our whitepaper library.
yes. if that's what the geotech recommends.  
i last used them at fort sill, ok, back in 2002. they drilled into some nice, stiff sandstone, i think, and worked fine.
i've seen them specified in few soils reports through the years.  seems like that was situations where they had possible heave from clay soils.  i re  
we use them a lot in mississippi.  we have highly expansive clays and the bell piers help resist heave.   
thanks.  i live in central oklahoma and have not seen them used in the 15 years that i've been practicing.  tried to specify belled piers when i first started as an engineer and found out quickly that drillers around here did not like the bells.  have not tried to spec since.  geotech reports do not specify bells, at least in the reports that i receive for my projects.  how are the bells inspected?   
i have used them many, many places in the upper midwest. use minimum straight shaft diameter of 30". maximum bell diameter 3 times the shaft diameter. very common for building construction!
here in nw florida all our foundation piers at our site have bell hole bottoms. most are 36" dia with a minimum 48" dia bell at 90' deep. our soil here is sand and hard pan and the piers are setting on 100 or so ft of hard pan.
anecdotal:
the best thing our construction people could see was the drilling company's drilling rig setting up on site at the close of a job. several offered to buy them a trailer to camp out on site.
when belled piers are used in expansive clays, is the bell acting at a lug in the ground?  how is the capacity of the uplift resistance determined?  any recommendations on texts for this problem?
yes, in expansive clays the bell serves to anchor the pier in the ground since the clays will, upon expanding, grab the pier and try to lift it.  
most of the south texas expansive clay projects i've worked on had belled piers with the geotechnical engineer providing guidelines on the required amount of reinforcing in the pier based upon pier diameter/surface area.

calculating the required reinforcing is not a problem, as i've done that with straight shaft piers socketed into shale or sandstone using skin friction.  i am not certain how to determine the uplift resistance provided by the bell itself.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-11 17:40 , Processed in 0.036654 second(s), 20 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表