concrete pier reinforcing

[复制链接]
发表于 2009-9-8 12:23:56 | 显示全部楼层 |阅读模式
concrete pier reinforcing
i have seen many large embedded concrete pier foundations for billboard sign columns and transmission tower columns placed without any pier reinforcing.
i assume the area of steel of the column itself (which is embedded deep into the piers) is thought to provide the minimum steel requirement and also to transfer axial load through the pier so that no horizontal ties are required.
if the pier extends a few feet above ground, should there then be minimum vert. reinforcing around the pier perimeter to control minor cracks people may see (like light poles in parking lots)? or is differential movement required for significant cracks, like a slab on grade???
check out our whitepaper library.
haynewp...in my area, just about everything gets reinforced because of the significant moment at the top of the shaft due to wind loads.  if the columns are indeed embedded deeply into the shaft or pier, then theoretically there might be no significant reinforcement issue; however, don't neglect the stress concentrations developed by embedded columns on the concrete.  if a column has significant bending stresses, it imparts those to the concrete, even if the stiffness of that section is greatly increased.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-13 07:11 , Processed in 0.037277 second(s), 20 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表