crane runway straightness and specs
i am designing an overhead under-running bridge crane for a manufacturing company: 1 ton capacity, 46 foot span, 75 foot runway length (supported at 25 foot intervals), class c service. i have ordered the cmaa 74 spec and plan to follow it as much as possible. from preliminary data and calcs (bridge weight of 4500lb, 2000 lb load + 500 lb trolley all on one side w/ 20% impact, stress 20% of uts) the runways will probably be s12x40.8, a572-50.
my main question is on the runways: i understand from this article:
i advise that you adhere to the cmaa specifications. there are two considerations: safety and serviceability. while the problems you mention may not cause a life-safety issue, there is the potential for lost revenues due to downtime of the system. there is also the possibility of higher maintenance costs for this system as opposed to one designed in accordance with the cmaa specifications.
i prefer sections that are produced for use as runways. for an underhung system, these sections are manufactured to tighter tolerances than is rolled steel. the sections also (typically) incorporate a hardened steel lower flange, which provides for greater resistance to wear and smoother operation of the system.
jeff crandlemire, p.e.
archer engineering
203-775-5673
look at the asme b30 series too:
b30.2 "overhead and gantry cranes (top running bridge, single or multiple girder, top running trolley hoist)"
b30.17 "overhead and gantry cranes (top running bridge, single girder, underhung hoist)"
etc., etc.
during my over 3 decade of crane and runway design, special beam for underrunning runway was used only if the trolley i.e. endtruck construction and wheel type required it.
for normal contoured wheel you can use std. beam there are built in clearance for the beam flange width fluctuation.
never ever faced underrunning beam problem regarding premature failure if the stress design is correct , the crane bridge is aligned properly.
the special beam is just an excuse.
with 1 ton capacity and 46 ft span, there should not be any need for ordering special steel for your runway girders. large capacity, long span high speed cab operated cranes can be critical in having straight parallel runways but the small pendant operated cranes are not as critical.
thanks to all for your helpful posts. i received cmaa 74 and have a few follow-up questions--
in determining "p" in section 3.3.2.6, do we generally assume the endtruck provides less than 4 wheel contact to the runway? i.e., local irregularities in the runway (even within cmaa specs), plus endtruck build tolerances, will probably result in non-4 wheel contact, giving twice the p as would ideally be expected. the "max wheel load" published by various vendors (ace, munck, demag) is more consistent w/ non-4 wheel contact. but, figs 3.3.2.6 in cmaa 74 imply 4 wheel contact. or, are dual c-channel endtrucks torsionally flexible enough to provide a crude suspension? i see section 3.6.5 discusses equalizer trucks, though i don't know when these are normally used.
for "case 2 load combination" (section 3.3.2.5.2), the formula doesn't make sense to me--it adds vertical and lateral forces directly, w/o vectors.
thanks again,
david
you are overreactin for a little 1 ton crane runway.
call me at 905-712-2373 if you want some solid info.
ernie
p.s. i did those things for 32 years at demag. trust me,
i agree with ehcet yours is really a small crane and standard beams will be enough, trust ehcet and myself i'm right now commisioning 7 diferent size overhead cranes.
cheers
sacem1 |
|