delivery of shop drawings
i have a question, when the shop drawings arrive at the architect office from the general contractor, who is responsible for getting those shop drawings to the structural engineer, is it the architect responsability to send them to our office or do we need to go get them.
thanks for your comments.

check out our whitepaper library.
have the general send a non-official set directly to your office to accelerate the review process.  (then follow the transmittal process from the general -architect/engineer/architect/general/subcontractor).
i would hope that the archie is competent enough to forward them to the appropriate reviewer.
the reason that i ask, is that we have work with an architect for a few years now, but every time there is a structural submittal they just call and tell us that there is a submittal for us, but they do not deliver the submittal, they want us to go pick it up. and if we do not pick it up like in the next couple of days then they start calling and getting upset for not picking up the submittal.
pick it up and charge them for the time.  make sure the charge is seperated out.
the architect is your client.
with that in mind - what is the good business practice to follow?
either talk to them about it or include it in your fees.

most everything we get today is electronic. is it possible to require electronic submittals where you get a copy. this speeds up the whole review process.
send a courier to pick it up and bill them with 10% markup on the delivery charge.
when you have reviewed the shop drawings, call the architect and tell them they are ready for him to pick them up.
imho the specifications should cover how shop drawings are handled.  i've dealt with engineers who refused to approve shop drawings, even though the specifications rerquired them to do so.  i've dealt with engineers who take 15 working days to return shops.  that is ok if it is written in the specs.  however when its not and a job is a fast track project it really slows down delevery when the engineer takes three weeks to return the drawing.
however i think jae is right.  if they were my client i would ethier have some one pick them up or request that the arch. courier them to me at my expense.
if the arch is the prime professional he should get them to you. he has a responsibility to his client to coordinate submittals and responses.
that said if he is refusing, you should arrange to get them and bill the project.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-15 07:26 , Processed in 0.036963 second(s), 20 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表