field welded moment connections-ibc
could someone explain their understanding of the construction requirements of a field welded moment connection for a omf in seismic site class d between a beam flange and column flange?  specifically, how are the welds supposed to be run out/ground off at their ends to eliminate stress risers.  also, i have been told that the bottom backer bar has to be removed, the weld back gouged and a 5/16 fillet placed over the original weld.  is this requirement only for a omf? only in class d? why is the bottom weld different then the top weld?
any thoughts would be appreciated.
jtpe:
with regards to the run-off tabs, please refer to fema 353, 4.2.
the 5/16" fillet is the reinforcing fillet weld noted in d1.1, figure 3.4 (tc-u4a-gf), note 7.
i recommend getting your hands on copies of fema 350 - 353.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-16 23:50 , Processed in 0.034888 second(s), 20 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表