几何尺寸与公差论坛

 找回密码
 注册
查看: 451|回复: 0

pile cap reinforcement above pile

[复制链接]
发表于 2009-9-15 12:21:49 | 显示全部楼层 |阅读模式
pile cap reinforcement above pile
is it as per aci detailing standard that the pile cap bottom mesh should be 12 inch high and pile steel should enter into pile cap run vertically 12 inch and than bend over pile cap bottom steel.
check out our whitepaper library.
our typical pile/pile cap detail calls for 6" of pile embedment and the bottom mat of rebar another 3" above that.  this is based on minimum of 3" cover for concrete formed against and exposed to earth.  we typically detail the pile reinforcement running up to the underside of the top mat with a 90 degree hook.  in my opinion, the hook would not be absolutely necessary as long as you have enough pile cap depth to develop the vertical pile reinforcement.  thus the reason for the hooked bar.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-18 00:05 , Processed in 0.037504 second(s), 20 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表