|
pdmworks workgroup-creating a daily report
hello,
i'm trying to help the gal in doc control by writing/creating a daily report on drawings that need to be released. i would like to do this report on one of our lifecycles in pdm call "submit to release". i know i can search (& save) the vault by this criteria "status", but can't seem to figure it out how to run it in "solidworks task scheduler". does the scheduler have this capability?
i would like it to run about 6:00am in the morning, and create a text doc on her desktop. this way when she logins in each morning, she'll know what needs to be released for that day.
thanks,
colin fitzpatrick (aka macduff)
mechanical designer
solidworks 2008 sp 3.1
dell 490 xp pro sp 2
xeon cpu 3.00 ghz 3.00 gb of ram
nvida quadro fx 3450 512 mb
i'm just a little verklempt. talk amongst yourselves. i'll give you a topic. pink floyd, was neither pink nor floyd. discuss!--"coffee talk" mike myers snl
posting in the eng-tips forums is a member-only feature. |
|