几何尺寸与公差论坛

 找回密码
 注册
查看: 547|回复: 0

concrete pouring methodology

[复制链接]
发表于 2009-9-8 12:28:24 | 显示全部楼层 |阅读模式
concrete pouring methodology
compute the deflection of the truss and the camber required in the
girder, the sum will be the requisite camber in the truss.
provide the requisite camber to the scaffolding, so that the final
deflected shape of the bridge girder would have the requisite camber.
be careful about concreting sequence.
m. hariharan
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-13 14:03 , Processed in 0.034824 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表