几何尺寸与公差论坛

 找回密码
 注册
查看: 503|回复: 0

entering and tightening clearances

[复制链接]
发表于 2009-9-8 22:35:21 | 显示全部楼层 |阅读模式
entering and tightening clearances
does anyone know if the entering and tightening clearances tables (i.e. 7-16 and 7-17) assume one bolt will be installed before the other?
i am looking at the graphic on page 7-82 for table 7-17 and wondering why the c1 distance is greater than the c2 distance.  i am thinking that to be generic, they should be equal.  
the only conclusion i can reach is that it is assumed that the horizontal bolt is placed first and therefore requires less clearance from the vertical bolt (which isn't there yet).  once the horizontal bolt is in place, the vertical bolt now needs that extra room (which is the difference between c1 and c2).
does anyone know if this is accurate?

from what i remember off the top of my head, yes, they assume one bolt is installed before the other and thus the different clearances.
have you checked the aisc commentary?
mightypirate, eit
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-16 13:18 , Processed in 0.035068 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表