slab and wall joints in concrete tank
in a liquid-filled tank, must construction joints in the wall align with the construction joints in the slab?  these are construction joints, not contraction joints--i.e., continuous reinforcement.
specifically, this is for a circular tank, and according to the specs, the slab will be placed in six pie-shaped segments, so that the joints align with the joints in the walls, which are limited to 60 feet placement lengths.  why does it matter whether the joints align?
aesthetics only.
i would recommend lining them up.  if you get a crack at the joint it might continue into the adjoining wall or slab and leak.  it won't be a lot of leakage, and it will close up, but it will still be there.
i sometimes have more joints in the walls than slab (usually twice as many), but i still try to match them up where i can.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-13 02:52 , Processed in 0.036763 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表