wall tie
i am currently designing a 40-feet high single story warehouse type concrete building (seismic zone 4).  the roof system is open web joist and metal deck (no concrete).  i am designing the wall anchorage to the diaphragm at the roof level for the walls running parallel to the open web joist.  what details are typically used and analyzed?
check out our whitepaper library.
this is probably a tilt up building which usually has embed plates with headed studs in the panels which are  used to weld to the continuous diaphragm ledger angle. this allows the shear transfer parallel to the wall.
some engineers also put in extra steel members in the plane of the diaphragm at this area to make sure the roof panels won't crush from the force coming in perpendicular to the wall.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|Archiver|小黑屋|几何尺寸与公差论坛

GMT+8, 2025-1-10 20:59 , Processed in 0.038629 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表