![]() |
application of snow drift loads on multi-stepped buldings
application of snow drift loads on multi-stepped buldings
i have a question on the use of the snow load provisions of asce7-05. we have a mid height canopy to a low rise theatre with a higher building adjacent to this. which length do i take for snow drift, the theatre roof only or the theatre roof plus the higher building? |
| 所有的时间均为北京时间。 现在的时间是 01:06 PM. |