![]() |
concrete pouring methodology
concrete pouring methodology
compute the deflection of the truss and the camber required in the girder, the sum will be the requisite camber in the truss. provide the requisite camber to the scaffolding, so that the final deflected shape of the bridge girder would have the requisite camber. be careful about concreting sequence. m. hariharan |
所有的时间均为北京时间。 现在的时间是 01:27 AM. |