查看单个帖子
旧 2009-09-07, 10:48 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 aitc technical note 26

aitc technical note 26
aitc technical note 26 was just brought to my attention
why not take the monkey off your back, have the individual or firm inspecting the bridge put a load rating to it, making sure you inform them in writing of the reduced fb situation. make sure you detail all this in the contract. see what happens.
mike mccann
mmc engineering
thanks for the advise msquared. generaly we do all of our inspections and load ratings in-house so i'm unfamiliar with the contracting aspects of load rating structures. if we do go the route you've suggested what would drive the ktr to give the bridge a higher load rating than would be suggested by the guidence in tn26?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)