查看单个帖子
旧 2009-09-07, 01:22 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 asce civil engineering magazine

asce civil engineering magazine
i don't know if anyone happened to read any of the letters to the editor in the october edition (pg#8). in short the article was about "dummy" members that the author felt were displayed incorrectly on an elevation drawing.
my question is about a comment the author made regarding "dummy" members in general. he said they were included in suspended truss bridges to enabable hand calculations before computers. how do they enable hand calculations? can a suspended truss bridge not be analyzed as an ideal truss without these members?
i am not a bridge engineer just interested in how calculations were historically done.
thanks in advance.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)