查看单个帖子
旧 2009-09-07, 10:01 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 calculating loads on concrete slabs

calculating loads on concrete slabs.
my employer would like me to try and calculate out if a new floor mount jib crane would overload the floor. i'm a junior engineer and haven't done more than simple beam calculations. here's my problem:
i'm assuming / deriving loads from various equipment in the area and simplifying as many calculations as i can. i've simplified it basically down to a section of floor loading a beam. my problem is that when you look at a cross section of the composite beam - structural steel/concrete/reinforcing rods and formwork, i'm not sure how or if i should include the formwork. (metal deck - like cladding) in my calculations.
does anyone know a good book / website that will help.

by floor mount jib do you mean a cantilever jib with a top and bottom bearing or a free standing, floor mounted 360 degree jib?
floor mount (second floor). free standing 220 degree rotation.
if i understand, you have a steel frame with metal deck and concrete floor, true? if so, determine if the deck is truely composite with the steel beam, ie studs and adequate reinforceing. the deck may just be puddle welded with a concrete fill.
the key load with jibs is the overturning which is going to put a torque and a bending moment on your second floor frame. good luck
you can find guide on the strength of slabs reinforced by the steel deck in a downdloadable pdef from a course at monash university
civ3221 building technology
composite floor slabs
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)