查看单个帖子
旧 2009-09-08, 12:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 concrete pouring methodology

concrete pouring methodology
compute the deflection of the truss and the camber required in the
girder, the sum will be the requisite camber in the truss.
provide the requisite camber to the scaffolding, so that the final
deflected shape of the bridge girder would have the requisite camber.
be careful about concreting sequence.
m. hariharan
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)