查看单个帖子
旧 2009-09-08, 01:18 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 connections for timber frame at roof eave

connections for timber frame at roof eave
i have a building that has an existing built-in gutter which is "hung" on the wall. we want to remove the gutter, install a new frame (looks like this < ) with the 2 members attached to boards along the wall. my question is: how should i connect member to member (bolted next to each other or top 2 by 6 resting directly on bottom 2 by 4) and member to board along wall. thanks in advance.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)