查看单个帖子
旧 2009-09-08, 05:06 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 delayed ettringite formation

delayed ettringite formation
for a pavement that is experiencing accelerated deterioration due to delayed ettringite formation, and that is near a minimum service level condition (i.e., nearly "failed"), has anyone had previous experience with being able to recycle this pavement by rehabilitating it with an asphalt overlay? (in this case, it's a reinforced pcc pavement.) any thoughts would be greatly appreciated.
check out our whitepaper library.
be careful with leaving any form of reactivity in place and placing anything over it. keep in mind that currently, in its failing condition, the expansion is relatively unrestrained. cracking and seating, then "encapsulating" the reactivity can cause an acceleration of the expansion and affect on the overlay.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)