查看单个帖子
旧 2009-09-08, 05:27 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 design loads for in service bridge shoring

design loads for in service bridge shoring
i am involved in timber bridge repair project that started out as a deck overlay replacement and is turning into a major rebuild of portions of the superstructure. significant decay has been found in some of the timber beams requiring them to be replaced. i am recommending temporary shoring of the structure as the owners insist that the bridge cannot be closed, but that at least one of the two lanes remain open to traffic. i cannot find prescribed design loads for this temporary shoring in asce 7-05. does anyone know where to find shoring design loads?
thanks
jethro
you should be using aashto, since its a bridge.
you have to calculate the loads in the shoring based upon your shoring configuration.
you shoud have a copy of the aashto specifications for temporary works.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)