查看单个帖子
旧 2009-09-08, 06:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 diaphragm chord in deep bottom bearing wood trusses

diaphragm chord in deep bottom bearing wood trusses
does anyone have any good ideas about providing a wood diaphragm chord in 3'-8" deep bottom bearing parallel chord wood trusses on a stud bearing wall? i normally design the stud wall top plate for this force, but am not happy with osb diaphragm tension and compression forces going through the osb wall sheathing to get into the top plate that is > 3'-8" away. detailing a double top plate up near the diaphragm boundary seems better, but this does not look easy to build.
also, does the permanent end bracing for such a system want to be wood or strap x-bracing? i know this is the truss manufacturer's deal, but would appreciate any comments here. thanks in advance. eric
i would detail a mechanism to transfer the chord force down to the top plate. personally, i think the osb could do this (re
thanks dave. i think that that's a good idea and one can view the 3'-8" portion of the wall above the top plate but below the roof diaphragm as a vertical sub-diaphragm. i'll block and nail this wall sheathing sufficiently to drag in the chord forces.
i share your concern. could you also require a 2x band at the top of the truss similar to a parallel chord wood floor truss? that could be deisnged as the chord, and it also could help with provising some stability.
regarding permanent end bracing, that is usually the responsibility of the building designer, not the truss designer, according to the "commentary for permanent bracing of metal plate connected wood trusses", by the wtca. the truss designer has to indicate where individual truss
sundale
check past postings on the wood section of this forum, i think your question has came up several times before.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)