查看单个帖子
旧 2009-09-08, 06:52 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 direct and continuous load path

direct and continuous load path
the ufc structural design criteria has the following statement under "1-9 load path continuity and integrity"
"direct and continuous load paths from the roof to foundation must be provided."
does the specific term "direct" indicate that transfer girders are not allowed for buildings designed per the ufc? is providing continuous and redundant (but not necessarily direct) vertical load paths sufficient?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)