查看单个帖子
旧 2009-09-08, 07:25 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 double tee wall connection detail

double tee/ wall connection detail
howdy,
every detail i've ever seen with a steel angle and expansion bolts at a wall top, have the bolts set or drilled into a bond beam. how else could to hold them in place and accept the load from the precast?
i also think you will find that building codes have lateral stability requirements for masonry walls that relate the wall thickness to the wall height and require either vertical core filling or a bond beam.
if you're in zone 2 or higher, you are required to have bond beams "continuously at structurally connected roof and floor levels..." see ubc 2106.1.12.3.
howdy (visitor)16 aug 02 12:55
thanks jedclampett
i am in south florida in a high velosity huricane zone.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)