查看单个帖子
旧 2009-09-08, 10:59 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 eucopoxy inject. to join a culvert wall separated from its f

eucopoxy inject. to join a culvert wall separated from its f
please, i would like to get some recommendation to join the wall of a culvert that was separated from its foundation. the separation is approx. 1-inch, the foundation has settlement. we are planning to use eucopoxy (euco #452) injection resin-structural bonding adhesive, however we were told that it can not be pumped. we also are planning to add a foundation slab along the existing, since the existing has settled. we would appreciate if through this helpful forum we can get more or better ideas to fill the 1-inch gap (almost 10' long) between the wall of the culvert and it's foundation.
thanks!

i would think it would be a good idea to fix the subgrade / settlement issue before tying the wall to the foundation. how about jacking the slab back up using grout?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)