查看单个帖子
旧 2009-09-09, 07:39 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 inquiry on concrete covers

inquiry on concrete covers
here is a basic question that i would like to find an answer. i am searching for farther explaination on concrete covers.
1.) minimum concrete cover for slab is 20mm while that of a beam is 40mm. why the difference considering that they have the same exposures?
2.) considering that the slab and beam is monolithically poured, the top concrete cover will have a variance (40mm for beam, 20mm for slab ). usually, what is done is that the top bars for slabs is placed on top of the main beam bars. this increases the slab concrete cover but reduces the effectivity of the slab considering it is designed for 20mm cover. is this the reason why cracks appear along the beam ( top portion )?
3.) what other effects can come from when the concrete cover of slab is increased to 40mm ( item 2 situation )?
4.) any suggestions to maintain the 20mm cover when monolithically poured with the beam?
thanks in advance.
just re-posted
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)