主题: load path
查看单个帖子
旧 2009-09-10, 11:09 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 load path

load path
i have read several threads noting the importanace of the "load path". can someone please explain to me what this really means and how would i go about getting more practice and/or understanding of this.
thanks
check out our whitepaper library.
it means follow the path the load would take to get to the foundation, or the earth. you may also apply the concept locally and say the path the load would take to get to its support. if the load can't get to the earth or a support, you have a problem (generally).
for example, if you put a load on top of an floor,
1. the floor must be able to support itself and the load
2. the beams supporting the floor must support themselves, the floor, and the load
3. the girders must be able to support themselves, the beams, the floor, and the load
4. the columns must be able to support themselves, the girders, the beams, the floor, and the load
5. the foundation must be able to support the columns, the girders, the beams, the floor, and the load.
hope this helps.
tngolfer,
a more generic way to say this would be that any load has to have a defined structural set of
every load has it's reaction ... in my case (aero) it's usually the airloads on the wing reacting the inertia loads on the fuselage; in your case (civil0 it'll be loads applied to the building being reacted by the foundation.
loadpath refers to the structure connecting the applied load to its reaction ... beams in bending, joints, columns, etc.
check this out - it really is a primer but explains the basics
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)