查看单个帖子
旧 2009-09-15, 11:03 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 site engineering of steel structures

site engineering of steel structures
im a steel erection engineer in scotland and would like to discuss the site engineering of structures(levelling plumbing/lining) with other eingineers or find websites relating to this
clarkson:
i was on a project not long ago where the steel erector used a laser for horizontal and vetical control. he set one building column, then mounted the laser on a rotatable mount that allowed him to change from horizontal to vertical alingment. his crew could then aline and plumb the following columns without having anyone on a transit. they just used the laser "reciever" (target) at the location they were working at. it really was slick and allowed much quicker steel erection.
clarkson,
first make sure the base plate levels are in accurate position and start to erect from "braced frame". then commence the erection to the adjusted frames respectively.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)