查看单个帖子
旧 2009-09-16, 12:19 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 sog punching shear

sog punching shear
pouring,
i believe that the punching shear in a slab on grade could be analized in the same way we do in spread footings. instead of the column base plate or pedestal, i would use the footprint of the concentrated load.
normally, unless the slab is very thin or the concentrated load very heavy, punching shear does not control the design of the slab. generally the design is controlled by the bending stresses.
aef
i would tend to agree with dlew's assertions.
punching shear check may be critical for a slab supporting high bay storage racking systems, or slabs with mezz columns......but the design approach for punching shear is the same for any slab, be it on grade, suspended , or for a pad base.
i agree with everyone, but i would advise using the punching shear formula for plain (unreinforced) concrete, in section 22.5.4 of aci 318-95 (unless your slab has at least minimum reinforcement per code).
pouring (visitor)15 jul 02 12:37
thanks!! i know how to apply it in that case!!
fyi - i usually have to analyze adding equipment in buildings which get placed on sog. hence, the reason why i need to check punching shear (and one way shear when applicable).
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)