几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » Norm Space: Product Automatic Standards - 范数空间:产品自动化标准 » National Standards » American standards
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-04-29, 08:33 PM   #1
yang686526
高级会员
 
注册日期: 06-11
帖子: 14579
精华: 1
现金: 224494 标准币
资产: 234494 标准币
yang686526 向着好的方向发展
默认 【转帖】inspection symbols

inspection symbols
i am new to this forum so please excuse any etiquette errors. i have just taken a position as the qc manager in a small job shop in northern vermont. the print that i am working on calls for the part in question to be marked in ink with both the part number (no big deal) and the inspection symbol. i have no idea what they are looking for or what they mean by inspection symbol.
the print in question is dated 1956 so i am assuming that they are not talking about gd&t symbols. the only thing that i can think is that they may need us to mark the inspection methods used like mpi (magnetic particle inspection) or fpi (fluorescent penetrant inspection).
any information would be greatly appreciated. thanks in advance -
russ
preci manufacturing inc.
could it mean the inspectors stamp to verify that it was inspected and who inspected it?
each dimension on the print is noted with a number so that once the part is completely measured, one can reference the dimension and reference number. all jobbing shops conform to this practice.
i am going to assume that you are not just producing one or two parts but once samples are approved, there will be some sort of production run.
the inspection symbols would relate to ongoing inspection noted on a "control plan" in automotive supply companies or "inspection plan" in non-automotive.
i would check other drawings and figure out the meanings of the symbols. one might mean that the feature (characteristic) is confirmed with an attribute gauge (positional at mmc as an example) while other symbols might a variable checking gauge. another symbol might reflect that spc is to be used.
now find out the fit and function of the part. from that determine if the process on the functional characteristics is rather loose or well controlled through manufacturing. now you can mark the drawing up reflecting the features (characteristics) that would require ongoing confirmation.
this information will be noted on a control plan with the sample size, frequency, specification, gauge used and what to do if the feature is non-conforming.
hope this helps.
dave d.
i would ask for clarification, but i think they are referring to your qc stamp. normally if you have more than 1 inspector, each will be given a unique stamp that can be traced back to a particular inspector. at my current company this is an oval with a number. at a previous company, they used shapes, like stars, circles, hexagons, etc.
"art without engineering is dreaming; engineering without art is calculating."
yang686526离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】inspection symbols with gd yang686526 American standards 0 2009-04-29 08:32 PM
【转帖】macro to save as pdf from sw2009 missing geometric tolerance symbols yang686526 SolidWorks二次开发 0 2009-04-12 06:56 PM
Get Display Dimensions, GTols, and Surface-Finish Symbols Example (VB) huangyhg SolidWorks二次开发 0 2008-03-23 08:41 AM
I opened up an earlier drawing and all the dimension symbols are shown as text call. huangyhg SolidWorks二次开发 2 2008-03-23 07:59 AM


所有的时间均为北京时间。 现在的时间是 03:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多