默认 【转帖】part quantities on schematics or sub assemblies

part quantities on schematics or sub assemblies?
our company is making a change and i was wondering what other companies have done and some pros and cons to each way of doing this. currently we quantify parts on the schematic bom and also call them out on the installation or sub assembly bom but give them a quantity of "0". for example a pump or a valve is currently quantified on the schematic bom, but called out as an item in the installation bom with a quantity of "0". we want to eliminate the "0" quantities and make "actual" quantities on the installation drawing boms and eliminate the call out on the schematic boms altogether. do other companines quantify components on schematics or installations? if not on schematics, then how do you note the expected performance of a component on the schematic for design analysis and trouble shooting?
i've seen part quantities listed on schematics, but i've never known those bills of material to be the controlling documents used by purchasing.
usually they are considered a "parts catalog" - something for the customer to use when ordering spares.
it was hard to get used to at first, but one outfit of my acquaintance put numbered balloons on the drawing field... and the bill of material _only_ in the mrp system's computer.
mike halloran
pembroke pines, fl, usa
i agree with the others. to list as "0" and indicated how you do boms now is extra effort and not efficient and can be confusing to others.
chris
solidworks/pdmworks 08 2.0
autocad 06/08
yeah, we kind of have the opposite. parts list (with qty) and balloons on the drawing. the schematic is typically the last sheet of the drawing and just has the components names/part numbers. there's no real link from the schematic to the parts list, for instance purely mechanical items (such as a bracket) aren't usually shown just electrical or pneumatic components/ routings etc. where applicable the schematic, or portions of it, are indicated as reference only.
not sure if ours is the best way, but yours definitely seems like it could be a pain.
kenat, probably the least qualified checker you'll ever meet...
i've always seen it done in the manner kenat uses.
believe it if you need it or leave it if you dare.fff"> - robert hunter
if the line printer had a relatively fresh ribbon, you got a nice printout of what you needed... and there was no possibility of phase errors between drawing and database.
mike halloran
pembroke pines, fl, usa
so there was an 'item number' field in the mrp system, and this always matched the drawing?
if so what mrp system, cause ours, at least the way we use it, don't accomplish anything near this.
kenat, probably the least qualified checker you'll ever meet...
right; the mrp system knew the item number, the drawing number, and the revision level, and could spit out flat or indented b/ms, wire lists, whatever you wanted.
it ran on an as/400, and may have been slightly customized for us, but i had the impression that it was basically a commercial product. unfortunately, i don't know who sold it or what it was called. i'm pretty sure it's been replaced with something graphical, and slower. it was state of the art, 20 years ago.
i thought all the as/400s had been discarded as junk a decade ago, but at my new job, we have one that is treated with great reverence, for reasons that elude me. the software we're using was apparently patched and adapted from some old pos software
( i mean that both ways, one much more strongly. i don't think i have ever seen an uglier or more bug-ridden kluge anywhere, and i have used and written a lot of ugly kluges. )
mike halloran
pembroke pines, fl, usa
our mrp (sfff">tops afff">ll pfff">roduction) can do the boms etc but not with item number. it has part/drawing number, rev, description etc but not item number.
given that our cad will automatically change the item number depending how you sort the parts list/as you add or delete items i don't see how our mrp could easily keep up, especially as we have no pdm/plm or real config control discipline.
kenat, probably the least qualified checker you'll ever meet...
three companies i've worked at placed all control of the boms in the plm ([un]agile or customized mgf/pro). to avoid double specification (in order to decrease the chance of error between two separate systems that have the same information), no drawings are allowed on boms on them. i've gone from being leary of this to now considering this method to be superior, at least from an enterprise-wide perspective.
matt lorono
cad engineer/ecn analyst
silicon valley, ca
yang686526离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】cad part numbering across parts and assemblies yang686526 American standards 0 2009-04-29 06:43 PM
【转帖】parts in assemblies yang686526 SolidWorks二次开发 0 2009-04-13 01:17 PM
【转帖】creating assemblies and parts from docmgr yang686526 SolidWorks二次开发 0 2009-04-13 10:04 AM
【转帖】macro to delete parts from assembliessub-assemblies yang686526 SolidWorks二次开发 0 2009-04-12 06:55 PM
【转帖】iterating through sub-assemblies yang686526 SolidWorks二次开发 0 2009-04-12 06:46 PM


所有的时间均为北京时间。 现在的时间是 04:31 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多