几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » Norm Space: Product Automatic Standards - 范数空间:产品自动化标准 » GD&T standards » Standard training » tec-ease(America)
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-05, 11:41 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 methods of justifying split ballooning

methods of justifying split ballooning
i have been in the industry for quite some time and have found split ballooning much more preferable in depicting parts in assemblies; particularly when using cad systems such as pro/e. however, i have found strong "old school" resistance from my boss to accept this new method of calling out parts on the face of the drawing.
asme y14.5.34, paragraph 3 defines "find no. or item no.", but does not describe a face-of-the-drawing symbol. in essence, asme standards do not specifically provide any requirements for this specific issue. strange!
i have lobbied to have a note included which defines the upper and lower half of the balloon to remove any ambiguity. beyond that, can anyone recommend any strategies, and/or suggestions, that will help argue my case?
are you talking about defining find number on top and quantity on bottom of your split balloon?
take a look at
my experience tends to reflect that of kenats. while it is not explicitly forbidden to use symbols other than a simple balloon on assy dwgs, i have never done so. the only situation where i have used split balloons is calling out datum points.
believe it if you need it
or leave it if you dare
i'm not sure why your boss is resisting this. i have worked with both ways of ballooning and prefer putting quantities in balloons, but yes it may amount to personal preference. i don't recall any specific standard. but when i have used split balloons in the machine tool and semiconducter machinery industries, the top half of the balloon was used for the item number, and the bottom of the balloon was used for the quantity in that specific area of the drawing.
perhaps (and i'm winging it), if your boss is reluctant to commit to posting a quantity in the lower half of the balloon, perhaps the quantity could be posted next to the balloon in parentheses.
in my 50 years in aerospace and working as a configuration manager with at least 100 companies, i have never seen split balloons or a standard showing them.
i have seen this before. the top number is the item number, the bottom number is the sheet number it is detailed on.
many of our customers request exactly what ctopher has described above.
folks-
this is a trap that people fall into way too often. many think that there is a "right" way and often spend an inordinate amount of time trying to find it. if there are no prohibitions against the split balloon in the asme (or iso) standards then by all means use it! if it makes you feel better then create a note that states what each half of the ballon is used for.
tunalover
thanks all for your replies. in spite of the replies, many companies i've worked for in san diego in various military and commercial industries actively use split ballooning. in addition, in finding the most automated method using pro/e, i can't justify anything other than split ballooning to get the work out. thanks too, to tunalover for your reply. i agree with you that there should be no prohibitions in using split ballooning. however, i have a boss from the 19th century who won't budge unless i provide him with ansi documentation to support it; inspite of it being for commercial applications. thanks again.
this is all i have found online.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】oddbtrace - methods missing yang686526 DirectDWG 0 2009-05-06 08:19 PM
【转帖】getsysvar and getangdir [individual methods for seprate sys yang686526 DirectDWG 0 2009-05-05 11:25 AM
【转帖】methods of justifying split ballooning yang686526 American standards 0 2009-04-29 08:49 PM
【转帖】ballooning indented boms yang686526 SolidWorks二次开发 0 2009-04-13 09:13 AM
【转帖】using methods vs seperate macros yang686526 SolidWorks二次开发 0 2009-04-12 10:45 PM


所有的时间均为北京时间。 现在的时间是 04:53 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多