默认 1.3 connection factor for concrete

1.3 connection factor for concrete
some engineers utilize a load factor multiplier of 1.3 for design of pre-cast concrete connections that are sensitive to tolerances or field welding (such as corbels and dapped ends). is this merely a design philosophy that some engineers practice or is this factor mentioned in either aci 318 or the pci design handbook?
from pci:
to ensure that the overall safety of the connection is adequate, the use of an additional load factor in the range 1.0 to 1.33 has historically been used by the industry. the need and the magnitude of this additional load factor for a particular connection must depend on the engineer's judgment and consideration of:
1. mode of failure: for failures which are typically precipitated by failure of concrete due to insufficient anchorage of connection reinforcement and inserts, such as short studs it may be appropriate to use larger load factors.
2. consequences of failure: if failure of a connection is likely to produce catastrophic results, the connection should have a larger overall factor of safety.
3. sensitivity of connection to tolerances: production and erection tolerances as well as movements due to volume changes and applied loads produce changes in load transfer positions on the connection. certain connections, for example corbels (see sect. 6.8) and dapped ends (see sect. 4.6.3), are more sensitive to load transfer positions than other connections, such as base plates. the magnitude of the additional load factor should be consistent with this sensitivity as well as the load transfer position considered in design. for example, if the most adverse combination of tolerances is used to establish the load transfer location, an additional load factor may be unnecessary.
4. requirements of local codes: to prevent a connection from being the weak link in a precast concrete structure, some codes require larger load factors to be used in the analysis and design of the connections. when these factors are used, it is not necessary to use additional load factors.
thanks for your help. can you tell me what page this is on?
6-4 of 5th ed.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
930-11 78 lvl to steel beam connection huangyhg 产品功能分析 0 2009-09-06 10:21 PM
【转帖】how to retreive the connection between oddbviewport and odgs yang686526 DirectDWG 0 2009-05-06 03:09 PM
【转帖】connection to the new dwgdirect dll yang686526 DirectDWG 0 2009-05-04 06:05 PM
【转帖】ado.net access操作方法 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-19 09:37 PM


所有的时间均为北京时间。 现在的时间是 02:23 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多