默认 14 story braced frame shear reaction

14 story braced frame shear reaction
given a 14 story steel structure with braced frames (r=3), is there a method used to transfer shear from the columns to the foundation more often than others?
i am familiar with shear keys and aisc's stance on transferring shear through anchor rods, but was curious what others would do in this situation.
i'm not a fan of the shear key after seeing it constructed. the tolerances for concrete are very different than steel and the bite of the key into the pier doesnt always work out the way it was intended.
i have considered welding plate washers with standard sized holes to the base plate, but wanted to hear some other opinions.
we've used traditional anchor bolts used to resist the tension uplift.
for the shear we:
1. add embedded plates (with headed concrete anchors) on either side of the base plate, embedded in the top of the concrete.
2. welded vertical steel plates to tie the base plate edges to the embedded plates - just to take the shear.
we use a similiar detail to jae but everything is post-installed to the workers have to remember to put in embeds or get them in the right position.
we just take l5x5 angles after the columns have been erected and prior to grouting, set them directly next the the baseplate, screw them into the foundation with titen hd screw anchors or soemthing similiar, and weld the vertical leg to the baseplates. the angles then serve as little side forms when they flow the grout in under the baseplate.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ransverse shear of plates huangyhg 精密机械 0 2009-09-06 09:34 AM
attaching geometric tolerance frame to a surface huangyhg tec-ease(America) 0 2009-09-04 04:55 PM
【转帖】composite two-single feature frame position tolerance yang686526 American standards 0 2009-04-29 07:00 PM
【转帖】attaching geometric tolerance frame to a surface yang686526 American standards 0 2009-04-29 06:33 PM


所有的时间均为北京时间。 现在的时间是 02:35 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多