几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 08:32 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 25 beam span analysis with owsj point loads

25' beam span analysis with owsj point loads
i know this is a no-brainer, but i'm having a bit of a brain freeze and don't have access to any books at the moment.
i've got a w12x27 beam, 25 foot span. there is a udl on the owsj putting a force of 12.45kips on the beam in three places, 6.25' apart.
i check the ireq and the beam has lots of capacity to also put a 1kip lifting load (5kips with fs=5)
to also check the mu for the beam, do i need to sum the moments caused by the three owsj loads, then the point load?
is the length for pl/8 still 25 feet if the owsj provide support every 6.25'?
i don't do this every day, and am still just a lowly eit...
have pity on me.
find a job or post a job opening
this sounds like basic analysis, simply putting together a simple span with a number of concentrated loads. since you are an eit, you should be working for a pe doing this kind of stuff....can you simply ask the pe?
never mind.
wow. you're using a w12 beam for a 25 foot span? you should definitely get the input of a pe. i also don't see how pl/8 applies to your situation.
are you neglecting the live load? situation you describe appears to be a roof condition. is it not?
speaking of mu, are you designing the beam in lrfd?
consult your supervisor for direction if you are not sure. to get the moment diagram, apply point load individually and superimpose each of the moment diagrams (long way), or use the equations in the aisc asd 9th edition beam equations (better way), or just use a computer program (easy way).
good luck
the moment can also be obtained by calculating your reactions, taking a section at the midspan, and summing the moments from all forces, udl's and reactions like we learned in the second week of statics 101. for deflections, use your steel handbook's beam formulas for each load separately and sum the deflections at the beam's midspan. i suspect your span to depth ratio is too high, thereby giving you excessive deflections!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM
【转帖】buggy intersectwith90 implementations yang686526 DirectDWG 0 2009-05-04 05:09 PM
【转帖】asme - where to star yang686526 American standards 0 2009-04-29 07:28 PM
[求助]遍历图块中子图元时,提取子图元的点数据如何不对 yang686526 ObjectARX(AutoLISP) 0 2009-04-22 07:46 PM


所有的时间均为北京时间。 现在的时间是 11:00 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多