几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 10:07 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 acip pile reinforcing design

acip pile reinforcing design
if the geotech. engineer is designing the acip(augered cast-in-place) piles, who determines if steel reinforcing is required and who designes the depth of the cage and size of the reinforcing. if structural designs the reinforcing, what methods are used. are there any guidelines or references. looking for how this is normally handled.
check out our whitepaper library.
typically, we (the structural engineer) usually call out the steel reinforcing in auger cast piles. we have some standard pile reinforcing details that we use unless there is something unusual about the pile ie: it is taking unusually high lateral loads or eccentricities.
for example: for 16" diamter piles we have a cage of 4-#6 bars around the perimeter with #3 ties. this cage extends 20 into the pile and 2'-6" into the pile cap. we also place 1 full length (usually a #9) bar down the entire length of the pile. the exterior cage is to handle any accidental or incidental bending on the pile from lateral loads or eccentricities. the center bar is to provide ductile continuity down the entire length of the pile and to engage the entire pile when we are counting on it to resist uplift.
others, i'm sure have different standards and opinions on the subject. just how our office does this.
the geotech should provide you with deflection and moment graphs for the different load conditions assumed and the head restraint (fixed or free). the pile reinforcing should be designed for the moments in the pile. you need the max steel at the max moment. at some point along the pile there is a point of fixity...no moment. usually the reinforcing cage will extend past this point a short distance. don't know exactly what this distance is. i have only seen center bars placed in a pile for uplift only and they have been full length like lkjh345 said.
lkjh345 you mentioned 16" diameter piles. do you know off hand what capacity a 16" is normally used for,.....i guess i am asking what is a common size pile diameter that you would expect for say, 40 tons, 12", 14", 16"?
barring something unusual in the geotech report or in the loading of the pile, we usually assume a 16" auger pile is good for 100 tons (200 kips). see section 1810.3 of ibc 2006. assuming 3,000 psi grout, this works out to 200 kips or 100 tons.
(full disclosure: our local building department has modified 1810.3 to allow for the maximum stress to be only 25% of the f'c. we therefore typically use 4,000 psi grout to get back to the 100 ton capacity for a 16" diameter.)
we estimate the length based on parameters of skin friction and end bearing set by the geotech. final length is determined in the feild by the geotech rep.
uplift resistance is based on parameters given by the geotech.
i have seen 14" diameter acip piles. i personally have never called for or seen anything smaller than a 14" dimater piles. doesn't mean they are not out there, just have never seen them used around my area.
might check with a local installer to see what the smallest they typically do in your area.
lkjh345 thanks for your help. i have only specified wood piles where the diameter is about 12", where i spaced them 2'6" or 3'-0" apart for a two-pile pile cap. what is the minimum recommended spacing for 16" diameter acip piles.
talk to the geotech for spacing. he will probably tell you 3 times the diameter..that is usually standard. any closer and you start to get group action, which reduces the capacity of the piles.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
acip pile reinf design huangyhg 产品功能分析 0 2009-09-07 10:06 AM
design process outline airfoilsengines huangyhg 精密机械 0 2009-09-05 10:36 PM
【转帖】value of drawing check yang686526 American standards 0 2009-05-04 11:08 AM
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 09:14 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多