默认 base for slab-on-grade

base for slab-on-grade???
on the contract drawings the engineer has specified that the slab-on-grade be placed on 鈥? inches of granular subbase compacted to 98% of its standard proctor maximum dry density in accordance with astm-d698".
the spec book defines 鈥済ranular subbase鈥?as follows: 鈥淕ranular subbase shall be sound and free-draining, such as sand, gravel or crushed stone with less than 10% passing the #200 sieve. maximum diameter shall be 1-1/2.鈥?br />
is the engineer giving the contractor 3 choices for granular subbase: sand, #57 stone, or crusher-run?
the spec book also has a section on 鈥淧lacement of granular subbase鈥?which reads: 鈥淐ompact granular subbase to 95 % of the maximum dry density as measured by the standard proctor, astm d698, with a water content within +3/-3 percent of the optimum moisture content.鈥?br />
a proctor on #57 stone? what鈥檚 that all about? would that be a method a, b, or c?
should this stuff make sense to me or am i missing something?
looks like the engineer did not coordinate their drawing notes with the contents of the specification - happens often. many times contract documents even include "boiler plate" language that says something like "...if the drawings and specifications conflict, the drawings have precedence..." (of course the it could be the specifications that have precedence - have seen it both ways)
the way it is written, sounds like the contractor does have three options - suggest letting the engineer decide - could be financial consequences (change order).
i don't think you are missing anything. in fact you seem to have a clearer view of the situation than the engineer - i don't think it is "written" anywhere that contract documents have to make sense - although they should.
boffintech...if you take all the requirements together, you immediately knock out the #57 stone as there is no definitive way to obtain a standard proctor on stone alone. the crusher run material would also be dropped out unless it has enough finer material to achieve some level of compactability. that leaves sand.
as sre said...poor coordination of the specs.
for this, i would consider that you have an unclear requirement and you should formally request an interpretation by the engineer or architect of record.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
auger cast pile grade beam details huangyhg 产品功能分析 0 2009-09-07 01:52 PM
anchor force of column base plate by aisc, youll find this huangyhg 产品功能分析 0 2009-09-07 11:56 AM
aluminum column base plates huangyhg 产品功能分析 0 2009-09-07 11:17 AM
3d correct modeling huangyhg 产品功能分析 0 2009-09-07 08:41 AM
【转帖】problem with purging layers yang686526 DirectDWG 0 2009-05-06 11:31 PM


所有的时间均为北京时间。 现在的时间是 04:05 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多