几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 05:47 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 built up section modeling

built up section modeling
i have a tough question on a project i am working on. we are using concrete pile foundation with shorecrete wall to retaining soils. retaining height varies from 8ft to 25ft....i am using 24'' to 30'' concrete pile with steel w beam in the middle. basically it is a soldier pile but it is not temporary.
there are huge moments at the base (assuming it is a cantilever columns embeded into soils). steel beam is very large if considering steel bending capacity only. i am thinking to use the composite section but do not know how to model this section in sap2000.
does any engineer here know how to model concrete pile section with w beam in the middle? thank you very much.
find a job or post a job opening
when the depth of excavation exceeds the capacity of the bare steel section as a cantilever, we usually add one or more tiers of tie-backs. this ends up being cheaper than a composite cantilever. sometimes tie-backs are difficult because they can extend beyond the property line. even then, it is usually more economical to negotiate a temporary easement to install the tie-backs.
tie back system can not work because it is over property line. outside of property line is caltrans right of way. no way to get permission from them.
if tie-backs are not an option you can try to design the composite cantilever system. you will need to reinforce the concrete cover and provide transverse confinement. see aisc specification chapter i.
you would be surprised how resourceful contractors can be in securing permission to install tie-backs. i once had a project with a 4-story deep excavation and the adjoining property owners refused to allow tie-backs. we designed the excavation shoring using a cross-lot bracing system. the contractor obviously hated the bracing because it complicated his construction sequences. so he negotiated the rights to install the tie-backs with the neighboring property owners and kept increasing his offer until they said yes. it still ended up being cheaper than the braced option. public agencies deal with easements all the time, so it might not be as impossible as you would think if you have the right connections and political savvy.
it will take a lot of time to get permission from caltrans, probably 1 year. for sure, client can not afford this timeline. perhaps, there are some telephone, electic or other embeded wires overthere, there will be a great chance for tie back cable to hit them.......
don't forget to check the capacity of the soil as well. i just checked a 30 ft. high secant wall system and the concrete piers, at 60" diameter, would overstress the soil at the base of the excavation. and the deflection at the top of the wall was 4 to 6 inches. way more than would be acceptable.
if tiebacks are not warranted, then you might consider a raker system.
mike mccann
mccann engineering
rackers are not bad, although hard to work around, you might try internally braced assuming your excavation plan dimensions are not to large, either way it is a pain.
you can freeze the ground big bucks....
soil nails may be an option depending on the geotech conditions, unless your right against the property line.
it is close to property line, only 15' to 20' away.
the retaining wall is part of the building (five stories total). we are planing to use 10'' concrete mat foundation. i think soil capacity shall be ok if we following flat pole design to get embedment (could be 50ft or more embedment) by putting piles at 8'-0'' o.c. w beam is w24x250 if no composite section.
what is raker system??? i do not have idea for that.
yes, it is a pain.......feel so bad.
rakers are inclined braces on the interior side of the excavation. can be efficient, but you face the same constructability issues i mentioned with the cross-lot bracing.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
built up section - sction modulus huangyhg 产品功能分析 0 2009-09-07 05:46 PM
section of a section huangyhg tec-ease(America) 0 2009-09-05 12:48 PM
【转帖】section of a section yang686526 American standards 0 2009-04-29 09:53 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM
Ug术语中英对照表cad部分 topology UG二次开发 1 2007-02-13 11:38 PM


所有的时间均为北京时间。 现在的时间是 11:06 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多