默认 concrete strength of drilled pierpedestal

concrete strength of drilled pier/pedestal
how long should a contractor wait after pouring a drilled pier/pedestal with embedded anchor bolts before placing the steel beam-column on it? the gravity loads are pretty minimal, but the moments under a wind load are pretty high.
basically, i suspect that my situation is similar to what the billboard erectors would experience. can anybody shed some light on how long concrete should cure prior to subjecting the foundation to any loads?
thanks.
find a job or post a job opening
hopefully you have taken concrete specimens and can do strength testing at intervals until you have the necessary strength.
if you are only erecting steel framework, you will not likely have loads that approach the design loads for at least the initial 28 days after concrete placement, so you should achieve f'c by then.
check the mix design and strength gain curves that can be provided by the concrete supplier. these should give you an idea of the compressive strength vs. time.
i would say maybe 3 days for building columns, about a week for signs and billboards, but i have seen big signs erected the next day. scary.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete compressive strength huangyhg 产品功能分析 0 2009-09-08 11:53 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM


所有的时间均为北京时间。 现在的时间是 01:33 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多