默认 drilled pier reinforcing

drilled pier reinforcing
this is a survey: what is your practice in establishing amount (if any) of longitudinal reinforcing in drilled piers that do do not have any moment other than that due to piers placed off-center?
for starters:
1) aci would let you use plain concrete if that works.
2) the fhwa publication on drilled shafts recognizes the aci approach, but goes on to say that fhwa prefers to use aci requirements for reinforced columns.
3) crsi 2002 design handbook recommends at least 1/2 percent longitudinal reinforcement, extending 3 shaft diameters (10' minimum) into the top of the pier, assuming adequate lateral support by the surrounding soil.

we usually get a recommendation from the geo-technical engineer. in cases where the geo-tech does not make any recommendations we use 1/2% longitudinal reinforcement extending a minimum of 1/3rd length of pile or 10 ft minimum.
here are a few threads from the past on this topic (sorta).
i don't feel comfortable have unreinforced sections in drilled shafts. the firm i work for has a policy of carrying a minimum of 0.008 x ag throughout the full length of the shaft. this also seems to be a nice compromise between 0.5% and 1%.
i use 1/2% to 1% steel, no vertical bars smaller than a #6 and #4 ties. not so much for code reasons but because the reinforcing cage needs to be stiff when it's being lifted and placed into the hole. it's my experience that contractors lift the cage with hooks attached to the ties. the #4's do not bend as easily as #3 ties. the #6 bars and larger help keep the cage straighter than #5. i live in an area where we have a lot of expansive soils. usually, if it's 30 ft or less, i'll reinforce the entire length. if it's a longer pier, i'll look at reinforcing less than the full length because standard bar lengths are typically 30 ft. longer reinforcing cages require couplers at splices. i just had a senior moment and can't recall the technical name of these (i'm at home and can't look it up), but i use the precast pier reinforcing guides for deep piers. the guides are half-moon shaped and tie to the longitudinal bars to help keep the cage centered in the shaft.
we typically provide 1%.
archeng- lenton is one proprietary name for the couplers. i think nmb splice is another.
we are not in a region of high seismic risk, and we use 1/2% minimum. we reinforce the full length of the shaft.
structuraleit, i wasn't referring to the couplers although i can see how you interpreted it that way. i could not recall the name of the cage alignment devices manufactured by pieresearch, which are called centraligner pier sleds. i use them often on pier shafts over 10 feet. also, i use pieresearch's hijacker pier bolsters on the bottom of the cage to help keep the rebar off of the bottom of the hole.
working in australia, if the bored piers are not required to resist uplift and the soil provides adequate lateral support, normal practice is to use .5% longitudinal reinforcement. normally use a spiral as the tie reinforcement. i usually specify the length as the full length expected, but do not add on extra length if a pier is lengthened due to bearing requirements.
the op mentions "no moment".
i hope there is a foundation or earthquake person to correct me if i am wrong; for piles that are in a seismic area but are not part of the lateral resistance of the building, i think some bending should still be considered. there is horizontal movement in the layers of soil beneath the building that is not uniform. in other words, there are layers of soil shifting at different rates and causing bending in deep foundations that are only supposed to be part of the gravity carrying
placing 1% steel in a pier where it is not warranted will get us accused of playing with house money.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
drilled pier boundry conditions huangyhg 产品功能分析 0 2009-09-08 07:43 PM
cutting trough wall on drilled piers huangyhg 产品功能分析 0 2009-09-08 04:22 PM
concrete pier reinforcing huangyhg 产品功能分析 0 2009-09-08 12:23 PM
big concrete pier huangyhg 产品功能分析 0 2009-09-07 03:45 PM
anchorage into concrete pier pier sizing huangyhg 产品功能分析 0 2009-09-07 12:01 PM


所有的时间均为北京时间。 现在的时间是 04:28 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多