几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 08:54 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 existing footing

existing footing
have a situation where the existing soils (or backfill debris) is resulting in combined footings to settle. we have decided to use helical piers to support the footings, however we are having to demo virtually all of the footing up to approx. 18" from the stl. column (creating a short span). i was looking for other ideas of supporting the footing, i.e. needle beam, etc.
any ideas appreciated. thanks
have you considered chemical grouting? it may/may not be a possiblity depending on soil conditions.
we used it on an existing project and it appears to be performing fairly well. we are monitoring the footings as be building on top.
contact a geotechnical contractor who specializes in foundation systems such as hayward baker or rembco. they can probably provide a more viable solution through the use of a grouting system.
you might consider the uretek system.
rik
thank you all for responses. we have decided to cut back a small portion of the existing footing to verify footing thickness (and then support that edge with a helical pier) and hopefully that will minimize the amount of cut back. unfortunately any type of grouting is not a viable solution due to poor soils to 10' below grade.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
enlarging existing footing huangyhg 产品功能分析 0 2009-09-08 10:33 PM
demolition of existing wall footing to install column huangyhg 产品功能分析 0 2009-09-08 05:07 PM
coverplating existing columns huangyhg 产品功能分析 0 2009-09-08 02:16 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM
anchor for concrete footing huangyhg 产品功能分析 0 2009-09-07 11:56 AM


所有的时间均为北京时间。 现在的时间是 07:41 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多