几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 11:09 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 failure modes

failure modes?
there is this contractor who is substituting a standard arm of an excavator to a much longer arm
(lengthened about 50%). he is using this excavator to drive down some steel c sections (size about 150-200 mm) into ground (these piles are like temporary supports for main excavation). he says that the operating condition is that the boom is only acting like a link to obtain deeper reach, and driving mechanism is attached in place of the bucket.
my question is that what can be possible failure modes of the excavator boom other than buckling? is there a need for a detailed fea analysis to ensure the structural adequacy of the boom?
have any one of you ever experienced failure of an excavator boom??
one possible failure mode is bending. another is overturning of the machine. another is overloading something else back behind the section in question.
i would not see this as something requiring fea.
if it's a link with pin joints at each end then you won't have bending. i'd do a static analysis on the loads to calculate the forces in each
longer arms are common for slurry wall trenching. only other change is new arm may have dual cylinders.
whats the reason for worrying? isnt this a means and methods for the contractor to worry about? also, whats the weight of the driving end? compare that to the regular arm bucket capacity and derive a overturning moment. i would defer this the the mfg too
thank you for the posts everyone..
we are worrying as we r responsible for submitting calcultions for this modification work and certify so tht the owner is worryfree
jrisebo,
perhaps the op is an engineer working for the excavator manufacturer.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
failure mode of window fasteners huangyhg 产品功能分析 0 2009-09-09 11:09 AM
concrete failure along steel surface huangyhg 产品功能分析 0 2009-09-08 12:05 PM
calculating mean time to failure of flexing ss tank top huangyhg 产品功能分析 0 2009-09-07 10:01 PM
aisc lrfd probability of failure huangyhg 产品功能分析 0 2009-09-07 10:39 AM
【转帖】odgsview render modes yang686526 DirectDWG 0 2009-05-06 08:58 PM


所有的时间均为北京时间。 现在的时间是 03:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多