默认 foundation issue

foundation issue
hello all;
we have a slight situation on our hands. we have a pre-cast column attaching to a pad footing, and the pre-cast column is poured already. they contractor has set the pad footing too high by a foot, and we don't have any piers. the pad footing is rather large, approx. 14' square by 27" thick (for shear). the load is approximately 450 kips. rather than telling our contractor to remove the footing or repour the column, we said that we will investigate making the existing siuation work. we are looking at notching out the 12" height of the footing (leaving us still 15") for the width of length of the column, and somehow trying to transfer the bulk of the load back up to the top of the footing. we have extremely solid soil directly below us as well. has anyone ever tried tackling something like this, or should i tell the guy to do it right? thanks for all input.
are you saying he poured it a foot too thick or the whole thing is a foot too high, if you carve out a pocket in the footing you will be cutting out the top mat of rebar, if any. you would also be reducing the capacity of the footing for punching shear, also i would be concerned as to the method of removing this. i had to do some thing similar for a roof leader and allowed about 3" carved out, but much smaller load.
if left as is, would it stick out of the ground?
that seems like a lot of liability to assume for someone else's mistake. taking 12" out of your footing thickness is quite a bit. is the column large, does that reduce your "d" and "h" by 12" for a lot of the footing area? i would imagine that if you have a column large enough to work for punchign shear with a reduced "d" then you may end up with problems with flexure. the footing is one of the last things you'd ever want to fail, especially with 450k of load.
will the higher footing be exposed above grade? does the bottom of the footing still meet the minimum depth set forth by the geotechnical engineering report? why can't you cut 12" out of the column length? sawing and cutting a 12" hole into the top of a footing is going to send energy and cracks all through the concrete and may disrupt the bond with the steel as well.
ucfse just gave me another thought, do you now have a frost issue if your footing is 12" too high.
the footing was poured 12" too high. there is no top mat of rebar. it is an interior footing, therefore frost is not an issue.
how is footing/column connection detailed? is there any way to cut off the column work from that end instead of footing demo?
the pre-cast column has pre-stressed tendons in it, therefore the idea of cutting it is extensive.
being this is an interior column, would not the whole footing be above the interior slab?
an update, we asked the pre-eng guys to re-pour the column. we all have to sleep at night
cutting prestressed tendons is no harder than cutting reinforcing. the price to cut and then set in non-shrink grout should be comparable to any other fix.
most pre-stressed items are utilize bonded reinforcing, therefore cutting the cables may not be as big a deal as in the case of unbonded cables. the cables will re-develop themselves within a couple of feet. you may want to check with the p/s manuf.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation for brick veneer - vertical extension ok huangyhg 产品功能分析 0 2009-09-09 01:31 PM
foundation design for settlemen huangyhg 产品功能分析 0 2009-09-09 01:27 PM
foundation cracking and settling huangyhg 产品功能分析 0 2009-09-09 01:24 PM
crack in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:20 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM


所有的时间均为北京时间。 现在的时间是 07:53 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多