how to increase pile cap capacity?
i'm a structural engineer working on a one story pre-cast concrete parking deck project supported by h-piles. now that construction of the foundations is nearly complete, we've been asked if another level can be added (until this point we had been specifically directed not to design for additional floors). among the many issues is the fact that even though we may have enough capacity in the piles themselves, the caps won't support the additional punching shear load. there is only aboout a foot or less to work with from top of cap to top of floor slab. i'm asking for ideas or experiences in dealing with this problem.
-jcali
check out our whitepaper library.
the most obvious is increasing the concrete strength to increase punching shear.
the caps are already in place.
the punching shear is due to the upward force of the pile (each individually) transferring load through the cap to a singular wall or column. if you have the vertical space, a steel bracket could be wrapped around the base of the column to create an extended footprint for the column, thus spreading out the column reaction from its initial cross sectional shape to that of a larger area....this might reduce the punching shear that would develop and the cap would become just a mass under compression.
sort of like steel columns where a singular base plate is not good enough and you use vertical, triangular stiffners around the column sides to reduce the base plate thickness.
jcali-
this is a new problem to me, but i have a few ideas. there's a lot to consider in solving your issue but perhaps these initial thoughts are a start:
1. increase the depth of the shear cone above each pile (and thus punching strength) by bonding (via vert dowels embedded in the existing cap and bonding agent) an additional layer of concrete above the cap. if the top of the existing cap is well roughened, no doubt that would help bond the two layers together. your vert dowels may need to be hooked to develop.
2. another design approach could be to reinforce this new layer for both bending and shear forces almost as if it was a shallow conventional reinforced concrete beam. you could easily add vertical stirrups in the new area, if needed, depending on your loads.
3. another idea might be to increase the bearing area of the piles on the underside of the cap by welding something to the steel at the interface between the cap concrete and the top of pile. you'll have to dig to do it. in essence you are making the shear cone wider.
4. can you drive more piles at this point near the existing caps and tie everything together with grade beams to increase capacity?
just a few thoughts. good luck.


what about some type of external grillage?
although the fondation has been placed, you may be able to increase your concrete shear strength by accounting for the actually concrete strength. check you concrete breaks and/or core your existing pile cap for an in-place strength check. aci 318 has provisions for checking in-place concrete strengths.
in-place foundation concrete strengths will often be higher due to the cooler, more humid surroundings in which they cure.
also, sharpen you pencil and check your punching shear calculations. verify you have applied the correct load and phi factors, and that you have accounted for both concrete and reinforcing steel shear strengths permitted by the respective aci provisions.
good luck.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
h piles - end bearing huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM
embedmentextension of piles into the pile cap huangyhg 产品功能分析 0 2009-09-08 10:14 PM
adjacent pile cap huangyhg 产品功能分析 0 2009-09-07 10:18 AM


所有的时间均为北京时间。 现在的时间是 11:44 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多