默认 industrial floor loads

industrial floor loads
can someone provide a good design reference for evaluating the capacity of an elevated two way slab for its ability to support a crane or forklift.
this question has come up in our office and we have referred the question to a civil engineer. before sending the solution to the engineer we were trying to determine over what area the load from the tires will act and how to evaluate this.
if there are some simplifying assumptions that can be used in the analysis that would be good. also is there a good design reference that i could aquire for similar problems. thank you.
check out our whitepaper library.
leave it up to the engineer to decide???
i am really confused! why are you refering this question to a civil engineer? this problem is more in the realm of a structural engineer's expertise.
if you are using a consulting engineer for the answer then why are you interested in coming up with a solution before you ask him?
if you are looking for one simple answer to this problem, there is not one. it is quite a complicated problem and must be analyzed in detail.
this problem can't be that difficult. there must be simplifying conservative assumptions that can be used to solve this problem. if the conservative assumptions prove to be a problem then a more detailed analysis is required.

any positive comments are appreciated.
i am used to designing to the code minimum or known crane/forklift loads whichever governs the design, unless the owner (typically transit authorities in my experience) specifically requests the whole floor to be designed for a heavier uniform live load.
code live loads may not be descriptive enough for your application. find out the need of your client before going too far with the design.
if the concentrated loads are small, you may be able to include them as part of the uniform load. if they are relatively large concentrated loads, you may have to analyze your 2 way slab by equivalent frame method or finite element method. you will have to use your judgement as to what is considered small or large.
i know of no simplified methods for two way slabs, however, there are a number of simplified methods for one way slabs.
the difficulty of the problem depends on the design of the existing slab and the size of the forktruck.
if your slab was properly designed as a two-way slab for 250 psf or more then a small lift will likely be ok.
a 15,000# axel load from a 2 ton forktruck on a skimpy slab likely won't be ok.
a good structural engineer should be able to do a couple of back-of-the-napkin sketches and tell you in 30 minutes how great your concern out to be.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
industrial facilities huangyhg 产品功能分析 0 2009-09-09 07:29 PM
guide lines on tendering for industrial design huangyhg 产品功能分析 0 2009-09-09 03:26 PM
glued laminated appearance grades huangyhg 产品功能分析 0 2009-09-09 02:43 PM
【转帖】asmeb107.100-2002-b94.9-1999标准 huangyhg American standards 1 2009-09-01 09:28 AM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 04:40 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多